Sample business value report
This is a finished example. Read the valuation, the scorecard and the five-year roadmap, then download the report and presentation. No sign-in needed.
Value your own businessExample assessment
Example: Regional Engineering Services Firm
Engineering and technical consulting services · 62 employees · Northeast United States
Scorecard
Top 3 strengths
- Sustainable earnings · 3.80
- Cash conversion · 3.80
- Competitive advantage and adaptability · 3.60
Bottom 3 weaknesses
- Low owner dependence · 1.60
- Customer diversification · 2.20
- Predictable revenue · 2.40
| Rank | Factor | Weight | Answered | Raw (5–25) | Average | Evidence confidence |
|---|---|---|---|---|---|---|
| 1 | Sustainable earnings | 0% | 5/5 | 19 | 3.80 | 0.75 |
| 2 | Cash conversion | 5% | 5/5 | 19 | 3.80 | 0.75 |
| 3 | Competitive advantage and adaptability | 10% | 5/5 | 18 | 3.60 | 0.75 |
| 4 | Structural margins | 0% | 5/5 | 14 | 2.80 | 0.75 |
| 5 | Profitable growth | 15% | 5/5 | 14 | 2.80 | 0.75 |
| 6 | Scalable delivery | 10% | 5/5 | 14 | 2.80 | 0.75 |
| 7 | Transaction readiness | 5% | 5/5 | 14 | 2.80 | 0.75 |
| 8 | Predictable revenue | 20% | 5/5 | 12 | 2.40 | 0.75 |
| 9 | Customer diversification | 15% | 5/5 | 11 | 2.20 | 0.75 |
| 10 | Low owner dependence | 20% | 5/5 | 8 | 1.60 | 0.75 |
How ties were broken
- Sustainable earnings and Cash conversion tie at 3.80 with equal evidence confidence; order is unresolved.
- Structural margins and Profitable growth tie at 2.80 with equal evidence confidence; order is unresolved.
- Profitable growth and Scalable delivery tie at 2.80 with equal evidence confidence; order is unresolved.
- Scalable delivery and Transaction readiness tie at 2.80 with equal evidence confidence; order is unresolved.
Value roadmap report
STAR Business Value Diagnostic and Five-Year Roadmap
Example: Regional Engineering Services Firm
Assessment version: 1.0 — initial assessment based on the supplied brief
Valuation date: September 1, 2026
Currency: USD
Financial periods: FY2023–FY2025 and TTM to August 2026
Owner objective: Sell a majority stake within five years at the highest supportable value while keeping the team intact
Target transaction date: Approximately September 1, 2031
Principal buyer: Private-equity-backed engineering platform
Primary transaction premise: Majority recapitalisation; owner remains for two years after closing
Implementation constraint: $250,000 annually; two senior project managers potentially available for leadership roles
Status and limitation. This is a complete roadmap framework with a provisional analytical conclusion—not a completed independent valuation or a financially validated investment plan. The supplied current valuation figures are reproduced exactly. Missing transaction evidence, operating metrics, implementation costs, and forecasts prevent a supportable numerical five-year valuation or proof that a particular portfolio maximises value.
Values are estimates, not offers, guarantees, appraisals, or promises of a sale price.
1. Executive conclusion
1.1 Current supplied valuation
App-calculated status: “Provisional: no.”
Independent assessment status: Provisional pending evidence review. The app’s flag is retained as supplied, but it does not establish that the underlying adjustments, comparables, or transaction terms have been independently validated.
The supplied figures use mixed rounding conventions. They are preserved rather than restated using a different precision.
1.2 What the diagnostic indicates
Three strongest factors
- Sustainable earnings: 19/25.
- Cash conversion: 19/25, tied with sustainable earnings.
- Competitive advantage and adaptability: 18/25.
Three weakest factors
- Low owner dependence: 8/25.
- Customer diversification: 11/25.
- Predictable revenue: 12/25.
The central value-creation challenge is not simply to increase earnings. It is to make the earnings less dependent on the owner, less exposed to individual customers, and more predictable and transferable.
The financial history supplied shows increasing revenue, reported EBITDA, and operating cash flow. However, these figures do not establish that a buyer can retain customers, replace the owner’s responsibilities, or reproduce the firm’s technical advantage after acquisition.
1.3 Four-strategy portfolio proposed for validation
Exactly four strategies are selected as the conditional planning portfolio:
Why these four: They address the most material apparent transferability weaknesses while preserving an identified strength. They also share information and delivery infrastructure, which may reduce duplicated implementation work.
Important qualification: This is a reasoned diagnostic selection, not a proven financial optimum. Costs, incremental economics, execution probabilities, and actual capacity are missing. Portfolio approval requires comparison with the other 14 candidates after the first evidence-gathering sprint.
1.4 Confidence
No probability of success or statistical confidence interval is assigned.
2. Business and buyer premise
2.1 Business profile
The firm is an owner-led civil and environmental engineering practice in the Northeast United States, employing 62 people.
Offerings
- Site design.
- Permitting.
- Environmental compliance.
- Construction administration.
Supplied customer-sector mix
- Municipal clients: 45%.
- Commercial developers: 40%.
- Utilities: 15%.
Important distinction: Sector mix is not customer diversification. The supplied percentages do not reveal the largest customer, top-five concentration, common ownership of developer entities, or dependence on a specific contract renewal.
2.2 Buyer comparison
The following are buyer-lens hypotheses, not claims about specific interested parties.
Primary valuation premise
Assumption P1: The current enterprise-value discussion refers to 100% of the operating business on a going-concern basis, with normal working capital delivered and debt/cash handled through the supplied equity bridge.
Gap: The precise conventions behind the supplied multiple range are unknown.
A majority recapitalisation does not mean the owner receives the full indicated equity value in cash. Ownership percentage, rollover, cash distribution, debt refinancing, fees, escrow, earnouts, and taxes remain unspecified.
Buyer and legal gates
Before launching a process, obtain qualified review of:
- State-specific engineering-firm ownership and professional-licensing requirements.
- Assignment and change-of-control clauses, particularly for public-sector contracts.
- Responsible-charge and professional-signature obligations.
- Intellectual-property ownership and third-party software rights.
- Professional-liability coverage, claims, and tail requirements.
- Employment, retention, and post-closing owner obligations.
A material restriction on ownership or contract transfer is a gating issue regardless of the survey score.
3. Evidence register and data quality
3.1 Evidence convention
The supplied brief identifies certain assertion evidence as “Verified record.” That is a respondent-supplied classification. No underlying financial statements, contracts, customer schedules, or other source files were available for independent inspection in this assessment.
Accordingly:
- Supplied fact: A figure or answer appears in the brief.
- Management representation: The underlying business condition has been described but not independently checked here.
- Agent assumption: An explicitly labelled planning convention.
- Agent inference: An interpretation of supplied information, not a documented fact.
3.2 Source register
Financial-period conflict
The profile says “audited-reviewed”, while the data register says “Reviewed financials.” Audit and review assurance are different. Obtain the accountant’s reports and resolve the description.
Assumption P2: FY-3, FY-2, and FY-1 correspond respectively to FY2023, FY2024, and FY2025. Fiscal year-end dates require confirmation.
3.3 Gap register
These gaps are material; none is filled with invented financial data.
4. Financial baseline and current valuation
4.1 Supplied financial history
Interpretation
Agent inference: The supplied history supports investigating earnings resilience and cash generation as strengths.
It does not establish:
- That all adjustments are nonrecurring.
- That gross-margin definitions are consistent across periods.
- That operating cash flow excludes temporary collection benefits.
- That historical growth can continue without additional staff or working capital.
- That the stated owner-replacement compensation covers all necessary roles.
The existence of “other adjustments” in every period merits review. It does not prove those adjustments are improper, but it weakens any unsupported assumption that unusual costs will disappear indefinitely.
4.2 TTM earnings normalisation
[ \text{Normalised EBITDA}
\text{Reported EBITDA} + \text{Owner compensation paid}
\text{Market compensation} + \text{Other adjustments} ]
[ $1,520,000+$480,000-$320,000+$45,000
\boxed{$1,725,000} ]
This reproduces the supplied normalised earnings exactly.
Normalisation review requirements
- Confirm that reported EBITDA already includes the stated owner compensation.
- Substantiate the $320,000 replacement-compensation estimate.
- Identify all necessary owner functions, including sales, management, technical oversight, and professional responsibilities.
- Confirm whether payroll taxes and benefits are treated consistently.
- Review the $45,000 legal adjustment for recurrence, insurance recoveries, related liabilities, and any continuing operating implications.
- Ensure PM leadership costs are not added to the forecast while also assuming those roles are already fully covered by the compensation normalisation.
The owner staying after closing does not eliminate the need for market-rate operating compensation.
4.3 Enterprise-to-equity bridge
[ \text{Indicative equity value}
\text{Enterprise value}
$500,000 + $0 ]
Assumption P3, embedded in the supplied computation: All $850,000 of cash receives the stated equity-bridge treatment.
Gap: Restricted cash, minimum operating cash, cash distribution mechanics, and the working-capital peg are unknown. The supplied $0 NWC adjustment is an input—not evidence that working capital will meet a negotiated closing requirement.
4.4 Current multiple conclusion
The supplied range is 5×–7×, with 6× as the midpoint.
No separate current-company adjustment is applied in this report because the peer transaction detail and relative-company evidence are missing. Retaining the supplied range for reference is not an independent endorsement of that range.
Owner dependence and customer concentration could support a lower outcome than a headline benchmark, or different transaction terms. A benchmark is not a floor.
5. Ten-factor diagnostic
All factors are ranked equally for diagnostic purposes. The percentage weights below apply only to the separate comparative multiple-assessment framework.
Tie treatment
- Sustainable earnings and cash conversion remain tied.
- Structural margins, profitable growth, scalable delivery, and transaction readiness remain tied.
- Evidence quality is supplied as equal, and economic materiality has not yet been quantified.
- The ties do not change the selected top-three or bottom-three groups.
No unsupported tie-break is imposed.
Confidence treatment
The uniform 0.75 confidence values are reproduced exactly. They are not interpreted as 75% probabilities or verified evidence-strength measures.
5.1 Conflicts requiring investigation
Metric ambitions
“Double a strength” and “halve a weakness” should refer to operating metrics—not survey ratings.
Possible tests include doubling qualified non-owner-led wins or halving owner-only approvals. These are illustrative ambitions, not adopted forecasts. Baselines, delivery capacity, and customer economics must be established first.
Halving a largest-customer percentage through rapid denominator growth may be unrealistic within five years and could destroy value if it encourages low-margin work.
6. The 18 candidate strategies
6.1 Candidate design rules
For each strength, the candidates address:
- Expansion of its economic benefit.
- Replication in another segment or offering.
- Durability and transferability.
For each weakness, the candidates address:
- Root-cause correction.
- A sustaining system.
- Exposure containment during implementation.
Cost status for every candidate: Initial cash cost, recurring cost, internal labour, displaced billable contribution, and maintenance cost are TBD. The $250,000 annual budget is a constraint, not a cost estimate.
Target status: Targets below are proposed planning directions. Numerical targets require approval after baseline measurement.
Owner status: Roles are proposed; named accountable individuals are missing.
6.2 Candidate catalogue
Each candidate requires its own initial and ongoing cost schedule before financial ranking.
7. Conventional, AI-assisted, and reusable-asset execution
7.1 Common AI acceptance standard
AI is optional. No AI initiative receives value merely because it uses AI.
For every AI-assisted variant, approval requires:
- A named business problem and comparison against conventional execution.
- Measured incremental benefit after software, integration, security, data preparation, review, training, maintenance, and error costs.
- Approved data access and vendor terms.
- Human accountability and documented quality control.
- Measured user adoption and a named system maintainer.
- A fallback process if the tool becomes unavailable or unreliable.
Current status for all 18 AI variants: Incremental net benefit, implementation effort, operating cost, adoption, and maintainability are unknown.
Client-confidential, municipal-sensitive, employee, or privileged legal material must not be placed in unapproved tools. Engineering judgments, public-safety decisions, professional certifications, and sealed work remain under qualified human responsibility.
7.2 Execution comparison
Initial execution preference: Start with conventional controls and reusable assets. Add AI only where a controlled pilot demonstrates incremental net benefit. AI is not required for the four selected strategies.
8. Strategy ranking and conditional portfolio selection
8.1 Evaluation method
The intended financial ranking is:
[ \text{Incremental portfolio value}
\text{PV of incremental distributable operating cash flows} + \text{PV of incremental exit proceeds} ]
subject to:
- The $250,000 annual implementation limit, once its scope is clarified.
- Leadership and delivery capacity.
- Necessary working capital and ordinary reinvestment.
- Legal and technical feasibility.
- Interdependencies and shared costs.
- Downside and execution scenarios.
Gap: The inputs needed to calculate this ranking are missing.
The table below is therefore a provisional diagnostic priority order, not an economic score or success probability.
8.2 Preliminary ranking
For each candidate, the following remain unscored financially:
- Incremental EBITDA and cash flow by year.
- Evidence confidence in the proposed effect.
- Probability of successful execution.
- Implementation and recurring cost.
- Capital requirement and internal hours.
- Quantified downside.
- Net post-acquisition benefit.
Assigning numerical scores now would manufacture precision.
Scope discipline
Baseline diligence, ordinary financial controls, and necessary legal compliance are not additional value strategies with claimed upside. Their costs must nevertheless be included in the funding model.
If completing those prerequisites would require a material fifth implementation programme, the four-strategy portfolio must be resized or reselected.
No outside-factor override is adopted. Material opportunities in structural margins, profitable growth, scalable delivery, or transaction readiness should trigger an adviser-reviewed comparison, not an undisclosed change to the 18-candidate procedure.
9. Selected portfolio economics and reusable assets
9.1 Asset ownership and unit economics
For every asset, the company must confirm employee/contractor assignments, client permissions, third-party restrictions, data-export rights, and post-sale transferability.
Asset existence creates no separate enterprise-value addition. Benefits must enter the operating forecast or a supported assessment of post-acquisition cash flows.
9.2 Proposed adoption path
These are stage targets, not adoption-rate forecasts.
Gap for each year: Eligible population, adoption percentage, usage frequency, maintenance hours, benefit per use, and cost per use.
9.3 Shared infrastructure and dependencies
R2 and D1 should use a common customer identifier where feasible. O1 account handovers should reference that system. A3 should reference project and offering definitions consistently.
[ \text{Combined implementation cost}
\text{Shared foundation} + \sum \text{strategy-specific costs} ]
Do not charge a shared CRM or data-cleansing build four times.
Benefits that must not be double counted
- A retained customer contributes once to revenue and contribution.
- D1 new-customer revenue is not also counted as an R2 retention benefit.
- A3 time savings become economic value only if they reduce cash cost, avoid hiring, or support profitable additional work.
- The same saved hours cannot simultaneously reduce payroll and create additional capacity.
- Owner time released is not automatically an EBITDA saving.
- A working-capital release is cash, not revenue or EBITDA.
- Any independently supported multiple benefit must concern future durability or growth not already counted twice elsewhere.
10. Causal map and funding controls
10.1 Causal map
10.2 Proposed capacity sequencing
Assumption P4 — planning allocation, subject to capability review:
- PM1 leads customer/revenue transition and later D1.
- PM2 leads delivery delegation and A3.
- The owner sponsors handovers and retains necessary professional responsibilities.
- The finance lead supports R2, customer economics, and funding control.
Gap: Neither PM’s available hours, leadership suitability, compensation requirements, nor replacement billable capacity is known.
Sequencing
- Establish baseline and role capacity.
- Pilot O1 and R2.
- Pilot A3 within a bounded technical workflow.
- Launch D1 only after delivery and customer-economics gates pass.
This avoids assuming the same two PMs can simultaneously run the existing business and four major programmes.
10.3 Budget control
No annual cost estimate has been invented.
For each year:
[ \text{Approved initiative cash spending}_t \leq $250,000 ]
Assumption P5: Pending clarification, use the limit conservatively to include incremental vendors, systems, training, backfill, and initiative-related cash expenditure. Track internal time and displaced contribution separately even where no additional cash payment occurs.
Ordinary working capital, debt service, taxes, and sustaining capex must also be funded. The implementation budget does not prove they are affordable.
Release rule: No material build commitment until there is an approved scope, quote or staffing estimate, cash schedule, accountable owner, capacity plan, and measurable gate.
11. Five-year implementation roadmap
11.1 Calendar and measurement convention
Assumption P6:
- Year 1: September 2026–August 2027.
- Year 2: September 2027–August 2028.
- Year 3: September 2028–August 2029.
- Year 4: September 2029–August 2030.
- Year 5: September 2030–August 2031.
All baseline values marked B0 are currently missing and must be recorded during Year 1. Later-year baselines are the verified prior-year results—not assumed improvements.
Investment notation: “TBD/cap” means a fully costed proposal is required and expenditure shares the annual $250,000 ceiling. It is not a zero-cost action.
Year 1 — Establish evidence and pilot transferability
Year 2 — Expand only validated practices
Year 3 — Demonstrate repeatability
Year 4 — Demonstrate durability and prepare diligence evidence
Year 5 — Validate exit readiness, not just presentation
12. First 90 days and quarterly governance
12.1 First sprint
Days 1–30: Validate the baseline
- Obtain and reconcile the financial statements and TTM accounts.
- Confirm the owner-compensation and legal-settlement adjustments.
- Inspect the top-20 customer schedule, including common ownership.
- Map owner responsibilities and PM capacity.
- Clarify the annual budget’s scope.
- Screen material contract, licensing, and ownership restrictions.
Output: Evidence register v1.1, normalisation issues list, quantified baseline metrics, initial capacity assessment.
Days 31–60: Design bounded pilots
- Design O1 delegation and relationship handovers.
- Assemble the R2 pilot dataset and define retention/backlog terms.
- Select one A3 workflow with measurable effort and quality outcomes.
- Test D1 segment demand and delivery feasibility.
- Obtain implementation quotes and internal-hour estimates.
Output: Four costed pilot proposals and a documented comparison with reserve candidates.
Days 61–90: Approve, revise, or stop
- Run authorised pilots.
- Record actual spending, hours, adoption, quality, and early operating effects.
- Build the initial BAU forecast.
- Model joint strategy economics and downside.
- Reconfirm or replace the four-strategy selection.
- Obtain qualified financial, valuation, legal, and tax review where required.
Output: Portfolio investment decision and model v2.0.
12.2 Quarterly dashboard
Each material assumption should progress through:
Hypothesis → pilot result → repeatable result → sustained transferable result.
Missing a gate leads to one of four decisions: stop, narrow, redesign, or defer. Benefits and valuation support must be reduced when evidence no longer supports them.
13. Current, business-as-usual, and roadmap financial model
13.1 Why no numerical five-year forecast is stated
The brief contains no approved forecast, quantified strategy economics, staffing plan, working-capital assumptions, or year-five balance sheet.
Therefore, assigning growth rates, margin gains, implementation costs, or exit values would invent data. The report provides the required model structure and explicitly marks the numerical gaps.
The current TTM earnings are a baseline—not a five-year forecast.
13.2 Business-as-usual counterfactual
BAU must include:
- Reasonable organic demand and known projects.
- Normal pricing, wage changes, and staff turnover.
- Existing customer risks and expected renewals.
- Normal reinvestment and working capital.
- Necessary owner-role compensation.
- Initiatives already committed before this roadmap.
It must not freeze EBITDA at $1,725,000 or assign all future growth to the roadmap.
13.3 Annual income statement and cash-needs schedules
TBD = required input/output not yet supportably estimable.
The ceiling row is not assumed spending.
Portfolio EBITDA equation
[ EBITDA_{\text{Roadmap},t}
EBITDA_{\text{BAU},t} + \Delta\text{joint contribution}_t
\Delta\text{leadership/backfill}_t
\Delta\text{initiative operating costs}_t ]
Joint contribution must account for customer retention, new-customer sales, delivery capacity, pricing, cannibalisation, and overlap.
Cash-flow treatment
[ UFCF_t
EBIT_t(1-\tau_t) + D&A_t
Capex_t
\Delta NWC_t ]
This is an unlevered enterprise cash-flow convention; entity-specific tax treatment requires adviser review.
- Expensed implementation costs already reduce EBITDA and must not be deducted again.
- Capitalised implementation costs are cash outflows when paid.
- All benefits must carry the staffing, maintenance, and reinvestment necessary to sustain them.
- Equity cash flow additionally reflects financing and distributions.
13.4 Principal valuation cases
For B and C:
[ EV_5 = \text{Normalised earnings}_5 \times \text{Supported multiple}_5 ]
[ Equity_5
EV_5
Debt_5
DebtLike_5 + EligibleCash_5 + ClosingAdjustments_5 ]
Required distinctions
[ \text{Increase from today}
EV_{\text{Roadmap},5}-EV_{\text{Current}} ]
[ \text{Incremental roadmap contribution}
EV_{\text{Roadmap},5}-EV_{\text{BAU},5} ]
These are different measures. Neither is a present-value investment return.
13.5 Scenario architecture
The supplied current low/mid/high values are multiple sensitivities. They are not validated probabilities or execution scenarios.
Numerical scenario outputs remain missing.
14. Multiple reconciliation
14.1 Evidence priorities
These weights total 100%. They are evidence priorities, not empirical valuation coefficients.
Required method
- Identify genuinely comparable transactions.
- Reconcile size, buyer type, geography, engineering mix, contract quality, earnings measure, and deal terms.
- Assess the firm as below, near, or above actual peers.
- Translate differences into post-valuation cash flows, reinvestment, and risk.
- Compare present value per unit of EBITDA under consistent conventions.
- Reconcile the implied multiple to observed transactions and disclose judgment.
Current peer-relative classification: Undetermined. Low internal scores do not by themselves prove performance below market peers.
No weighted score is converted into multiple turns.
Year-five rule
A year-five multiple reflects expected results after Year 5. Improved Year-5 EBITDA does not automatically justify a second valuation benefit.
For example:
- D1 customer wins enter revenue and contribution once.
- Independently evidenced lower post-sale customer-loss exposure may support future cash-flow durability.
- The same expected loss cannot be deducted from the forecast and then fully deducted again through a risk haircut.
No standalone AI or “asset ownership” premium is applied.
15. Sensitivities, downside, and cost of delay
15.1 Required sensitivity analysis
Customer-loss sensitivities should use lost contribution and unavoidable cost—not lost revenue alone.
15.2 Cost of delay
A defensible delay calculation compares two complete schedules:
[ \text{Cost of delay}
PV(\text{on-time portfolio cash flows and exit proceeds})
PV(\text{delayed portfolio cash flows and exit proceeds}) ]
It must capture deferred spending as well as deferred benefits. It must not assume all delayed expenditure is lost or that every projected benefit would have occurred.
Gaps: Benefit timing, discount rate, spending schedule, financing, and exit timing.
Conclusion: Cost of delay is presently unquantified.
15.3 Present value
A nominal September 2031 equity value is not equivalent to current value.
[ PV(\text{future owner proceeds})
\sum_t \frac{\text{expected owner cash receipts}_t}{(1+r)^t} ]
The discount rate, distribution policy, sale percentage, tax assumptions, contingent-payment probability, and timing remain missing.
16. Equity value and owner-proceeds bridge
16.1 Current versus transaction proceeds
The supplied equity values refer to the indicated business equity under the stated bridge. They do not establish the seller’s proceeds from a majority recapitalisation.
Rollover equity is an investment retained after closing, not cash proceeds. An earnout is contingent consideration, not guaranteed cash. Post-closing employment compensation should be kept separate from sale consideration.
Tax-specific conclusions and final transaction modelling require qualified human review.
16.2 Value-change attribution
For an earnings-multiple model, an exact enterprise-value attribution can be written:
[ \Delta EV
(E_1-E_0)M_0 + E_1(M_1-M_0) ]
The first term attributes change to earnings at the original multiple. The second attributes the remaining change to the multiple.
Then:
[ \Delta Equity
\Delta EV
\Delta NetDebt + \Delta OtherClosingAdjustments ]
Use this bridge separately for:
- Current to Year-5 BAU.
- Current to Year-5 roadmap.
- Year-5 BAU to Year-5 roadmap.
Do not assume that accumulated cash both increases terminal equity value and has already been distributed to the owner.
17. Annual reassessment and version control
Reassess by each August year-end and after any major customer loss, acquisition, regulatory event, owner-role change, financing event, or material market shift.
Each reassessment should update:
- Financial statements, normalisation, and actual cash conversion.
- All 50 assertions and supporting evidence.
- Top-three and bottom-three factor selection.
- The 18 candidates and the four-strategy portfolio.
- Costs, capacity, shared assets, and causal overlaps.
- BAU and roadmap forecasts.
- Buyer assumptions and current comparable transactions.
- Supported multiple and equity bridge.
- Owner proceeds, exit timing, and team-retention objectives.
Required historical archive
Retain:
- Source files and dates.
- Named data owners and evidence grades.
- Assumption register.
- Calculation workbook.
- Pilot outcomes and rejected alternatives.
- Adviser judgments and overrides.
- Portfolio and budget approvals.
- Version-to-version valuation bridge.
Separate valuation changes caused by actual performance, forecast revisions, market conditions, and methodology.
This report does not imply that such an archive has already been created.
18. Targeted information requests
To keep intake manageable, obtain information in three batches.
Batch 1 — Validate current value and principal risks
- Upload FY2023–FY2025 statements and accountant reports, plus monthly 2026 and TTM accounts.
- Upload the owner-pay/role analysis and the support for the legal adjustment.
- Upload the top-20 customer schedule with revenue, gross profit, customer-group affiliations, and renewal dates.
- Confirm cash/debt dates, debt-like detail, restricted cash, and working-capital treatment.
- Provide the source transactions supporting the 5×–7× range.
Batch 2 — Test the portfolio and funding
- Provide backlog, pipeline, retention, and contract data with definitions.
- Provide project profitability, utilisation, write-offs, rework, and receivables/WIP ageing.
- Confirm the two PMs’ skills, interest, available hours, and required compensation/backfill.
- Provide the current budget/forecast and clarify what the $250,000 annual limit includes.
- Identify current CRM, project-management, finance, document, and security systems.
Batch 3 — Build exit and owner-proceeds estimates
- Confirm ownership, intended sale percentage, desired rollover, and acceptable contingent consideration.
- Provide material contracts, licences, IP assignments, employee-retention arrangements, and known claims.
- Provide debt schedules, capex plans, tax/entity information, and distribution policy.
- Obtain adviser input on buyer comparability, valuation conventions, and transaction structure.
Appendix A — Assertion record and score reconciliation
Codes below reproduce the supplied evidence labels:
- V: Verified record.
- C: Corroborated management estimate.
- U: Uncorroborated representation.
They do not indicate independent verification in this report.
All 50 assertions have ratings. No missing response has been treated as neutral.
Missing for all assertion records: Respondent identity/date, source-file reference, consequential-answer explanation, and independently reviewed supporting metric. Respondent disagreement was not reported and cannot be assessed.
Appendix B — Assumptions and material judgments
All roadmap targets, ownership assignments, and dates beyond the supplied brief are proposed planning assumptions—not representations of current performance or guaranteed outcomes.
Appendix C — Calculation and review notes
Calculations reproduced
- Normalised TTM earnings:
$1,520,000 + $480,000 − $320,000 + $45,000 = $1,725,000. - Net debt:
$1,200,000 + $150,000 − $850,000 = $500,000. - Current enterprise values, equity values, and display precision: retained exactly as supplied.
- Factor averages: raw factor score divided by five.
- No numerical forecast, implementation cost, saving, discount rate, execution probability, or multiple premium has been invented.
Human-review priorities
- Accountant/quality-of-earnings adviser: Normalisation, assurance level, revenue recognition, cash conversion, owner-role compensation.
- Valuation/transaction adviser: Comparable selection, current value range, buyer lens, year-five multiple, final valuation judgment.
- Legal counsel: Professional ownership/licensing, contract transfer, IP, liabilities, retention, and transaction documents.
- Tax adviser: Entity structure, rollover, sale allocation, taxes, and after-tax proceeds.
- Licensed technical leadership: Delegated professional responsibilities, technical-asset quality, and any AI-assisted engineering workflow.
Final decision recommendation
Approve the 90-day validation sprint, not an uncosted five-year investment commitment.
Keep the supplied current valuation as the reference case. Prioritise proof that the firm can retain customers, deliver quality work, and generate cash without the owner at the centre of every critical activity.
Release implementation funding in stages. Publish numerical five-year BAU and roadmap valuations only after the financial baseline, portfolio costs, capacity, customer economics, and transaction evidence support them.
As-is valuation
$9,850,000
Equity value, mid multiple
- Baseline period
- TTM
- Normalised earnings
- $1,725,000
- Net debt
- $500,000
- Enterprise value (low–high)
- $8,625,000 – $12.1M
- Enterprise value (mid)
- $10.4M
- Equity value (low–high)
- $8,125,000 – $11.6M
Know What Your Business Is Worth — And How To Raise It.
Create an account, enter your financials and rate 50 value statements. Get a valuation and a five-year roadmap.